Jira Ticket Management Operating Standard

Table of Contents​

OrderAreaGovernance FocusExpected Outcome
1Introduction and Strategic ObjectiveEstablish the purpose, operating discipline, and documentation expectation for Jira-driven work.Jira remains the common record for requirements, decisions, evidence, approvals, and closure.
2Jira Classification StandardsDefine the correct Jira project and ticket type before work enters planning or assignment.Tickets are raised in the correct project and classified as Story, Support, Bug, or Question.
3Ticket Requirements and Workflow RulesStandardise intake details, reviewer checks, workflow gates, evidence requirements, and closure rules.Each ticket moves forward only with the required context, ownership, approval, and validation trail.
4Planning and PrioritisationControl weekly planning, readiness checks, clarification timelines, priority swaps, and status hygiene.Planned and urgent work remains visible, justified, owned, and traceable.
5Specification and Template StandardsDefine document storage, specification usage, test case linkage, and template selection rules.Teams use consistent documentation standards across projects and ticket types.

1. Introduction and Strategic Objective​

1.1 Purpose​

This operating standard defines the common process for raising, classifying, reviewing, progressing, approving, and closing Jira tickets across DH implementation, product, application, and Data Manager work.

The standard ensures that every requirement, support request, defect, clarification, decision, approval, test outcome, RCA, and release action is recorded in Jira or in a linked controlled document. Jira must remain the official system of record for work intake, execution tracking, ownership, and closure.

1.2 Scope​

This SOP applies to Jira tickets raised under the following work areas:

Work AreaCoverage
Client ImplementationClient-specific requirements, configuration, extraction, stream setup, UAT support, production support, and movement activities.
DH Product DevelopmentProduct binaries, product-level enhancements, and product defect fixes.
DH ApplicationApplication screens, UI behavior, application support, application defects, and application enhancements.
Data ManagerData Manager screens, UI behavior, DM application support, DM application defects, and DM application enhancements.

1.3 Strategic Objective​

The objective of this SOP is to improve planning discipline, ticket quality, delivery traceability, and closure control by standardising how work is classified and progressed in Jira.

Objective AreaStandard Outcome
Work intake qualityTickets are raised with all the information required for triage, planning, assignment, and review.
Classification accuracyEach ticket is raised under the correct Jira project and classified as Story, Support, Bug, or Question before work begins.
Planning readinessWeekly and mid-week planning decisions are based on clear scope, priority, evidence, owner, and dependency information.
Requirement clarityFunctional specifications, assumptions, expected outputs, test expectations, and approval requirements are documented before development starts.
Support controlRuntime failures, data issues, configuration issues, and production concerns are investigated with logs, evidence, impact, and RCA trail.
Defect disciplineBugs are raised only when implemented behavior deviates from an approved Story, specification, or accepted test case.
Ownership visibilityCurrent owner, pending action, blocker, approver, and next step remain visible in Jira throughout the ticket lifecycle.
Audit readinessDecisions, approvals, test evidence, release evidence, RCA, and closure comments remain traceable for future review.

1.4 Operating Principles​

PrincipleRequired Practice
Jira is the source of truthDecisions, clarifications, approvals, status movements, and closure evidence must be posted in Jira or linked from Jira.
Classification comes firstProject and ticket type must be confirmed before the ticket enters active planning or assignment.
Evidence drives progressTickets should not move forward on verbal context alone; required documents, logs, samples, approvals, or test evidence must be linked.
Scope must remain controlledAny new requirement, change in expected behavior, or post-release issue must be raised through the correct ticket path.
Closure must be defensibleA ticket should be closed only after the outcome, validation evidence, and final decision are documented.

2. Jira Classification Standards​

2.1 Classification Model​

Jira classification must be completed before a ticket is accepted for planning, assignment, or execution. Classification is not only an administrative step; it determines ownership, approval path, workflow, evidence requirement, and closure standard.

Classification LayerQuestion to AnswerControl Objective
ProjectWhere should the work be tracked?Route the ticket to the correct ownership, planning, approval, and release path.
Ticket typeWhat kind of work is being requested?Apply the correct intake, review, workflow, evidence, and closure standard.

A ticket must not be classified only by urgency, requester preference, or expected assignee. The classification must reflect the actual nature of the work.

2.2 Project Routing​

ProjectClassification StandardJira Client Field
DHIMPLUse for client-specific implementation, configuration, extraction, stream setup, UAT support, production support, movement, or client environment work.Actual client name
DHPRODUse for core DH product binaries, product logic, product enhancements, product defects, and product release work.SURYA INTERNAL
DHAPPUse for DH RunControl Web Application screens, UI behavior, application support, application defects, and enhancements.Actual client name for client-specific work; SURYA INTERNAL for product-level work
DMUse for Data Manager rules, rule changes, configuration, execution support, failures, reconciliation, output investigation, or enhancements.Actual client name for client-specific work; SURYA INTERNAL for product-level work

2.3 Ticket Type Routing​

Ticket TypeClassification StandardTypical Outcome
StoryUse when planned work or approved change is required.Scope is reviewed, approved, developed, tested, released, and closed.
SupportUse when an existing operational issue needs investigation or assistance.RCA, action taken, and validation result are documented.
BugUse when approved behavior is not working as documented, tested, or released.Defect is corrected, regression is validated, and release/closure evidence is recorded.
QuestionUse when clarification is required before execution can proceed.Answer or decision is documented; follow-up Story, Support, or Bug is linked if work is required.

2.4 Classification Decision Guide​

If the Request Is AboutRaise As
New development, enhancement, setup, movement, extraction, AutoSys, or configuration changeStory
Run failure, scheduler issue, configuration issue, production support, UAT support, or RCA requestSupport
Mismatch against an approved Story, functional specification, accepted test case, or released behaviorBug
Feature availability, expected behavior, configuration doubt, feasibility, ownership, or correct ticket pathQuestion

2.5 Classification Acceptance Check​

A ticket is classification-ready only when the following points are clear.

Readiness ItemAcceptance Standard
ProjectThe ticket is raised under the correct Jira project: DHIMPL, DHPROD, DHAPP, or DM.
Ticket typeThe ticket type correctly reflects the request: Story, Support, Bug, or Question.
Client valueThe client field follows the project standard: actual client name or SURYA INTERNAL.
ContextThe ticket clearly states the requirement, issue, defect, or clarification needed.
EvidenceRequired documents, logs, screenshots, samples, specifications, or test references are attached or linked where applicable.

2.6 Reclassification Rules​

When review confirms that the original ticket type is no longer correct, the required follow-up ticket must be raised or linked by the responsible BSA/Support owner. Work must continue under the workflow rules of the newly classified ticket type, not under the original ticket by exception.

Situation Identified During ReviewRequired Action
Support investigation confirms that a permanent change is required.BSA/Support must raise or link a Story.
Support investigation confirms that approved behavior is broken.BSA/Support must raise or link a Bug with the supporting investigation evidence.
Bug review confirms that the expected behavior was not approved or documented.BSA must stop the defect path and raise or link a Story if a change is required, or a Question if clarification is required.
Question response confirms that execution work is required.BSA/Support must raise or link the appropriate Story, Support, or Bug.

3. Ticket Requirements and Workflow Rules​

3.1 Story​

A Story is used for planned delivery. It may represent new development, enhancement, setup, movement, extraction, AutoSys work, configuration change, or production movement.

3.1.1 Story Intake Requirements​

RequirementMandatory Standard
ClientUse the actual client name for client-specific work. Use SURYA INTERNAL for product-level work.
Jira summaryProvide a clear summary of the requirement or change.
DescriptionExplain what is needed, why it is needed, and what business/regulatory/operational driver applies.
Functional specificationAttach the link to the approved/reviewable functional specification stored in the OneDrive ticket folder.
Input detailsDocument source files, tables, fields, formats, filters, dates, record-count expectations, and sample data where applicable.
Output detailsDocument output files, reports, fields, derivations, formats, grouping keys, reconciliation expectations, and sample expected output where applicable.
Business logicDefine calculation rules, mapping rules, conditions, defaults, validations, exceptions, and fallback behavior.
Test expectationsProvide positive scenarios, negative scenarios, edge cases, reconciliation checks, regression scenarios, and volume scenarios where applicable.
Impact and dependencyIdentify impacted binaries, streams, reports, extractions, application screens, and release dependencies.
Approval pathIdentify required BSA, Product Lead, Client Lead, PCC, or other approval before development/release where applicable.
Target timelineMention expected delivery date, client commitment, or planning priority where applicable.

3.1.2 Story Review Responsibilities​

RoleResponsibility
ReporterEnsure the requirement, scope, functional specification, assumptions, approvals, and test expectations are complete before BSA acceptance.
Product/Client LeadConfirm approval on the details shared by the Reporter.
Dev reviewerReview feasibility, missing details, data availability, edge cases, performance impact, configuration impact, and regression scope before dev acceptance.
ImplementerDevelop only the approved scope and raise Jira clarification before implementing any undocumented behavior.
Code reviewerReview logic, regression risk, error handling, logs, validation, and maintainability before code review closure.

3.1.3 Story Workflow Gates​

Workflow GateRequired Control
Func. Spec. Accepted by BSAOnly the authorized Lead BSA or Client Lead BSA may move the ticket to this status.
Func. Spec. Accepted by DevDev reviewer must confirm feasibility and raise all open clarifications in Jira before accepting.
Before releaseRelease notes, package details, and deployment instructions must be provided by the Developer in Jira and GitHub as per the Development Guideline.

3.1.4 Story Acceptance Authority​

Change TypeAuthorized BSA Acceptance
Product-level change under DHPROD, DHAPP, or DMProduct Lead BSA as applicable.
Client-specific change under DHIMPLClient Lead BSA.
Change impacting PCC or product releasePCC approval must be provided in Jira, and Dev Owners must be part of PCC discussions and email communication.

3.1.5 Story Reopen and Follow-up Rule​

Once a Story has been moved to Production or marked Stable by BSA, it must not be reopened for new work or post-release correction.

Post-release SituationRequired Action
Approved functionality fails after releaseRaise a new Bug and link the released Story.
Additional requirement or behavior change is requestedRaise a new Story and link the original Story.
Clarification is needed on released behaviorRaise or link a Question before creating executable work.

3.2 Support​

A Support ticket is used for operational assistance, run investigation, RCA, configuration issue, or production/UAT support. Support is not a substitute for planned development or defect correction.

3.2.1 Support Intake Requirements​

RequirementMandatory Standard
ClientUse the actual client name for client-specific support. Use SURYA INTERNAL for product-level support.
Issue summaryState what failed, what is blocked, or what assistance is required.
EnvironmentMention SIT, UAT, Production, server, region, client environment, or application environment where applicable.
Process detailsProvide stream name, process name, batch/binary name, run ID, process ID, as-on date, execution date/time, and scheduler/job details where applicable.
Error evidenceAttach logs, diagnostic logs, console output, application logs, scheduler logs, screenshots, or exception details.
Data evidenceAttach input files, output files, rejected records, count comparison, sample records, DB query output, or reconciliation sheet where applicable.
Configuration evidenceProvide config path, metadata values, parameter values, connection details, AutoSys/job configuration, or deployment details where relevant.
Expected vs actualRequired when output, data, behavior, or status does not match expectation.
Business impactMention blocked run, delayed delivery, missing output, wrong output, downstream impact, production impact, or client commitment.
Action requestedClearly state whether analysis, RCA, setup correction, validation, explanation, deployment coordination, or confirmation is required.

3.2.2 Support Review Responsibilities​

RoleResponsibility
BSA/Support ownerConfirm support scope, collect maximum evidence, document business impact, and coordinate closure validation.
Dev reviewerReview logs/config/data evidence to proceed with investigations.
DeveloperIdentify probable cause and provide RCA in Jira.

3.2.3 Support Workflow Controls​

Workflow PointRequired Control
Before investigationLogs, environment, run details, action requested, and impact must be available.
During investigationRCA progress, observations, assumptions, missing evidence, and next actions must be updated in Jira.
If permanent change is requiredBSA/Support must create or link a Story. Development must not continue only inside the Support ticket.
If approved behavior is brokenBSA/Support must create or link a Bug with supporting evidence.
Before closureRCA, action taken, validation result, and follow-up tickets must be documented.

3.2.4 Support Closure Outcomes​

Closure OutcomeRequired Closure Note
Issue resolved without changeRCA, corrective action, and validation evidence.
Data/config/environment issueRoot cause, corrected value/path/setup, owner of correction, and validation evidence.
Permanent change requiredLinked Story with summary of required change.
Approved behavior brokenLinked Bug with expected-vs-actual evidence.
Not reproducible or insufficient evidenceEvidence reviewed, missing information, and reason for closure or pending state.

3.3 Bug​

A Bug is used only when implemented behavior does not match a Story, functional specification, accepted test case, or released behavior. A Bug must have an approved baseline; otherwise the request must be handled as a Story or Question.

3.3.1 Bug Intake Requirements​

RequirementMandatory Standard
ClientUse the actual client name for client-specific defects. Use SURYA INTERNAL for product-level defects.
Original Story/spec linkLink the approved Story, functional specification, test case, or release reference that defines expected behavior.
Defect summaryState what is not working in clear business or operational terms.
Expected behaviorDocument the exact expected output, value, file, status, calculation, validation, or UI behavior from approved evidence.
Actual behaviorDocument what actually happened, including output, error, mismatch, failed step, or observed behavior.
Reproduction detailsProvide environment, run command/process, input file/table, configuration, as-on date, run ID, and steps to reproduce.
Observation test caseProvide test case ID, test input, expected result, actual result, and failed assertion where applicable.
EvidenceAttach logs, screenshots, output files, DB results, comparison sheets, rejected records, or application evidence.
ImpactMention affected client, release, production/UAT run, downstream process, regulatory output, or operational delivery.
Priority reasonExplain why the defect is high, medium, or low priority based on impact and timeline.

3.3.2 Bug Validity Checks​

CheckStandard
Approved baseline existsA Bug is valid only when expected behavior is already approved or released.
Expected vs actual is clearThe ticket must show a concrete mismatch, not only a general concern.
Reproduction is possibleInput, config, environment, and steps must be sufficient for review or reproduction.
Requirement gap is excludedIf expected behavior was not approved, the ticket must move to Story or Question.
Environment/data issue is excludedIf the cause is setup, permissions, scheduler, data, or config outside approved behavior, handle through Support unless a defect is confirmed.

3.3.3 Bug Review Responsibilities​

RoleResponsibility
BSA/Support ownerProvide expected-vs-actual evidence and link the approved baseline.
Dev reviewerValidate defect scope, reproducibility, RCA direction, and whether the issue is code, data, config, environment, or requirement gap.
Fix ownerImplement only the approved defect correction and avoid adding unapproved enhancement.
Code reviewerReview fix logic, regression risk, impacted paths, validations, logging, and error handling.
BSA testerValidate the fix against the failed scenario and required regression scenarios.

3.3.4 Bug Workflow Gates​

Workflow GateRequired Control
Before defect acceptanceApproved baseline, expected-vs-actual evidence, client value, impact, and reproduction details must be present.
Before fixRCA direction, failed scenario, fix scope, and regression scope must be clear.
Before code reviewFix details, impacted logic, unit/developer validation, and regression considerations must be available.
Before testingBuild/package details, failed test case, expected output, and regression test cases must be available.
Before releaseFix validation, regression evidence, release package, and required approvals must be linked.
Before closureFinal validation result, release confirmation, and closure summary must be documented.

3.3.5 Bug Reopen and Follow-up Rule​

Once a Bug has been moved to Production or marked Stable by BSA, it must not be reopened for additional correction or new behavior.

Post-release SituationRequired Action
Another defect is found after releaseRaise a new Bug and link the released Bug.
Requirement change is neededRaise a new Story and link the original Story.
Expected behavior is disputedRaise or link a Question before further execution.

3.4 Question​

A Question ticket is used when clarification is required before work can be classified, planned, approved, assigned, or executed. It is used to record decisions and prevent work from proceeding on assumptions.

3.4.1 Question Intake Requirements​

RequirementMandatory Standard
ClientUse the actual client name for client-specific clarification. Use SURYA INTERNAL for product-level clarification.
Exact questionState the question clearly. Use numbered questions if more than one clarification is required.
ContextMention client, module, binary, stream, application screen, Data Manager rule, configuration, environment, release, or product version where applicable.
Current understandingDocument what the requester currently believes or assumes.
Decision neededState what answer is required to proceed.
EvidenceAttach screenshots, config snippets, sample files, logs, previous Jira links, or documents where relevant.
Required dateMention the date/time by which the answer is needed if planning or delivery is blocked.

3.4.2 Question Review Responsibilities​

RoleResponsibility
BSA/Support ownerFrame the question clearly, provide context, and link follow-up work if the answer requires execution.
DeveloperProvide answer, limitation, feasibility, configuration behavior, or product behavior based on available evidence.

3.4.3 Question Workflow Controls​

Workflow PointRequired Control
Before responseExact question, context, current understanding, and decision needed must be available.
During clarificationAssumptions, dependencies, missing inputs, and reviewer observations must be documented in Jira.
If execution work is requiredBSA/Support must create or link Story, Support, or Bug based on the answer.
Before closureFinal answer, decision, limitation, next action, or linked follow-up ticket must be documented.

3.4.4 Question Closure Outcomes​

Closure OutcomeRequired Closure Note
Answer providedFinal answer, assumptions, and evidence used.
Story requiredLinked Story and summary of approved/required change.
Support requiredLinked Support ticket and reason investigation is needed.
Bug identifiedLinked Bug and expected-vs-actual basis.

4. Planning and Prioritisation​

Planning must be based on ticket readiness, business impact, priority, dependency, and ownership. A ticket should not enter active planning only because it is urgent; it must first have the minimum information required for its ticket type.

4.1 Weekly Planning Rules​

Planning ControlStandard
Ticket availabilityThe ticket should be accepted by Lead BSA on or before Wednesday so it can be reviewed for the upcoming weekly plan.
ClassificationThe Jira project and ticket type must be checked before the ticket is raised.
ReadinessThe ticket must contain the minimum intake details, context, and evidences required for its ticket type.
Dev reviewer clarification timelineOnce Lead BSA acceptance is provided, the Dev Reviewer must review the ticket and raise any required clarification within 2 working days.
Clarification closureOpen clarifications raised by Dev Reviewer should be resolved before Friday first half wherever possible.
Priority basisPriority must be supported by business impact, release timeline, client commitment, production impact, or product dependency by the BSAs.
Mid-week priorityAny mid-week priority must state which existing planned item is swapped or pushed.
Reclassified ticketsReclassified tickets must go through the planning process under the new ticket type. They must not bypass planning or be taken up through the original ticket.
Status hygieneJira status and latest comments must reflect actual progress, blocker, owner, and next action.

4.2 Priority and Swap Rules​

Priority SituationRequired Action
Planned weekly workWeekly planning is prioritised based on readiness, business impact, release date, client commitment, production impact, and dependency.
Swap between planned ticketsIf BSA wants to swap one existing planned ticket with another existing planned ticket, it is BSA's responsibility to discuss the change and provide the swap ticket details in Jira.
Mid-week new requirementOnce the ticket meets the acceptance criteria, BSA must review the effort shared by the Dev Reviewer and provide the ticket to be swapped, delayed, or retained for planning.
Priority collisionBSA/Support must identify the impacted ticket and document the swap, delay, or retained commitment in Jira.
Production issueProduction issues must receive the highest priority once the required details are clear. The Dev Reviewer must confirm that the issue details are sufficient to proceed and Dev Reviewer should plan it.
Release date and client commitmentBSA must consider that release dates are planned 2 days after the due date. Client commitments must be communicated and planned with this release gap.

4.3 Status Update Rules​

Status ControlStandard
Actual progressJira status must reflect actual progress, not expected progress.
Comment disciplineEvery material status movement must have a Jira comment or linked evidence.
Owner clarityTickets must not remain active without a current owner, blocker, or next action.
Decision trailDecisions taken over call, chat, or email must be summarized in Jira.
Blocker visibilityBlockers must clearly mention what is blocked, who owns the next action, and when the next update is expected.
Closure disciplineTickets must not be closed without final outcome, validation evidence, RCA/decision where applicable, and linked follow-up ticket where required.

5. Specification and Template Standards​

This section defines how functional specifications, test cases, approval references, investigation templates, and supporting documents must be prepared, stored, linked, and maintained for Jira tickets.

5.1 Specification Applicability​

Ticket TypeSpecification / Template Requirement
StoryFunctional specification and test cases are mandatory wherever the ticket involves new development, enhancement, setup, movement, extraction, AutoSys, configuration change, output change, or production movement.
BugApproved baseline, observation details, expected-vs-actual evidence, test evidence, and fix validation details must be linked.
SupportInvestigation/RCA templates must be used where the ticket involves production issue, run failure, data issue, configuration issue, or repeated operational concern.
QuestionClarification template must be used where the question needs formal decision tracking, feasibility confirmation, ownership confirmation, or follow-up ticket creation.

5.2 Document Storage Convention​

All functional specifications and test cases must be stored in OneDrive(DHIMPL Teams) under a structured ticket-specific folder. This convention is mandatory for every Story and Bug ticket.

Mandatory Folder Structure:

<CLIENT NAME> / <TICKET ID> / <files>
RuleStandard
Client folder nameFor client projects, use the exact client name, such as AXIS, HDFC, or ICICI. For product, utility, or internal development work, use SURYA.
Ticket folder nameUse the exact Jira ticket ID, such as DHIMPL-1234, DHPROD-567, DHAPP-89, or DM-101.
Folder contentsStore the functional specification, test case file, input/output samples, validation evidence, approval references, and supporting documents for that ticket.
Jira referenceAdd the direct OneDrive folder link or document link in the Jira ticket before the ticket is treated as ready for review.
Version controlRevised files must carry a clear version or date so the approved version can be identified.

Folder Examples:

AXIS / DHIMPL-1234 / DHIMPL-1234_Functional_Spec_v1.0.docx
/ DHIMPL-1234_Test_Cases_v1.0.xlsx
/ DHIMPL-1234_Sample_Input.csv

SURYA / DHPROD-567 / DHPROD-567_Functional_Spec_v1.0.docx
/ DHPROD-567_Test_Cases_v1.0.xlsx

5.3 Document/Template Selection Guide​

TypeUse When
Development Specification DocumentNew Development or Logic change in existing binaries.
Extraction Specification DocumentNew extraction, field addition, layout change, mapping change, downstream file change, or extraction format change.
AutoSys Specification DocumentNew AutoSys job, schedule change, dependency change, alerting change, or recovery handling.
Run-Control Setup Specification DocumentNew stream setup or new process setup in an existing stream.
Loader Specification DocumentLoader mapping, validation, load rule, rejected record handling, or source-to-target movement.
Production Movement DocumentApplicable for clients where one click installation is not present and hand pick movements happen
Configuration Setup DocumentNew configuration setup, parameter setup, metadata setup, environment-specific setup, or controlled configuration change.
Bug Ticket Intake TemplateDefect evidence, expected-vs-actual comparison, observation test case, reproduction details.
Support Ticket Intake TemplateRun failure, production issue, configuration issue or operational issue.
DocumentsOneDrive Link
Development Specification DocumentOpen in OneDrive ↗
Extraction Specification DocumentOpen in OneDrive ↗
AutoSys Specification DocumentOpen in OneDrive ↗
Run-Control Setup Specification DocumentOpen in OneDrive ↗
Loader Specification DocumentOpen in OneDrive ↗
Production Movement DocumentOpen in OneDrive ↗
Configuration Setup DocumentOpen in OneDrive ↗

5.5 Templates for Bug and Story​

5.5.1 Bug​

Original Story:
Environment:
Binary Version / Release Version:

1. Defect Summary
- What is not working:
- Defect observed in:

2. Expected Behavior
- As per functional spec / approved test case:
- Reference section / test case ID:

3. Actual Behavior
- Observed output / behavior:
- Difference from expected behavior:

4. Reproduction Details
- Input:
- Config:
- Run steps:
- As-on date / run date:
- Reproducible: Yes / No

5. Evidence
- Logs:
- Screenshots:
- Input/output files:
- Comparison sheet:
- DB query / record sample, if applicable:

6. Impact
- Client impact:
- Priority reason:

7. Test Case Observation
- Test case ID:

5.5.2 Support​

Client / Product:
Environment:
Stream / Batch / Binary(with version):
As-on Date:
Issue Date / Time If Applicable:

1. Issue Summary
- What failed:
- Where it failed:
- Since when:

2. Evidence
- Error log:
- Diagnostic log:
- Screenshot:
- Input/output sample:
- Config path:
- Scheduler / job details, if applicable:

3. Expected vs Actual
- Expected:
- Actual:
- Difference observed:

4. Impact
- Business impact:
- Production / UAT impact:

5. Action Requested
- Analyze:
- Correct setup:
- Provide RCA: